Yellow_River_Sediment_Flushing_Begins_at_Xiaolangdi_Dam video poster

Yellow River Sediment Flushing Begins at Xiaolangdi Dam

In Henan Province on the Chinese mainland, the Xiaolangdi Dam has kicked off the 2025 pre-flood water and sediment regulation phase. The dam’s outflow, once clear, has turned turbid as it begins discharging over 100 million tonnes of sediment until July 9.

This annual flushing is a vital operation for flood control and maintains smooth navigation along the Yellow River. It also raises intriguing questions: How does the dam efficiently clear such a massive sediment buildup, and what additional measures will follow once the flushing concludes?

Mixing the raw force of nature with modern engineering, this natural cleansing operation is like a live-action blockbuster scene—full of energy and spectacle! 🌊🚀 Stay tuned for more on-site updates as experts and local teams work to ensure the dam’s continued efficiency and safety.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back To Top